Latest News

Archive for the ‘Uncategorized’ Category

Phase SI hit the road

Phase SI hit the road

Phase SI carried out a GPR survey along a 300 m stretch of carriageway in Northumberland to check for features that could be causing localised subsidence.

Health and safety

Health and safety

Phase SI has been assessed and have had their Health and Safety procedures confirmed as being CHAS compliant and congratulations to Nikki for passing the NEBOSH General Certificate in Occupational Health and Safety.

GPR survey of a cathedral nave

GPR survey of a cathedral nave

Phase SI recently carried out a ground penetrating radar (GPR) survey inside a cathedral to look for graves and tombs.